#EC-KPI-03 Energy Centre monitoring points operational
| Element | Energy Centre (EC) |
| Standing | HNTAS · assessed |
| Monitoring points | all EC points |
| Threshold | 100% of ARMS-connected points |
| Calculation | points with no error/negative/out-of-range values ÷ total points |
| Period | Monthly |
#Discuss this KPI
Is the threshold right? Does the calculation match what you compute on your networks? Comment on EC-KPI-03, or report how it behaves on your data. Comments are public and are read before every revision.
#Machine-readable
This KPI is a row of kpi-reference.json (element EC, code EC-KPI-03). The notation and rules that apply to every KPI are on the reference page.
#Related KPIs on the energy centre
- EC-KPI-01 Energy Centre ARMS connectivity
- EC-KPI-02 Energy Centre monitoring point data completeness
- EC-KPI-04 Energy Centre unplanned interruptions
- EC-KPI-05 Energy Centre planned interruptions
- EC-KPI-06 Energy Centre average flow temperature
- EC-KPI-07 Energy Centre average return temperature
- EC-KPI-08 EC flow temperature variance from set point
- EC-KPI-09A EC volume weighted average flow temperature (VWAFT)