92 KPIs across 5 element types, generated 2026-10-25. Download: JSON · PDF, landscape A4. Every code links to its own page, where it can be discussed.

Generated 2026-10-25. Generated from the platform's KPI registry. A working basis for a proposed British Standard on heat network key performance indicators.

How to read the tables

One table per element type, in network order from the energy centre to the dwelling. The layout follows the KPI tables of the HNTAS Milestone 4 technical specifications so the two can be compared row by row; the columns that differ carry the detail a KPI needs to be computed the same way on every network.

Column Meaning
Code <element>-KPI-<nn>; a letter after the number is a variant (A reported form, B weather-compensated or per-source form). -C- marks the cooling form of a KPI; -M- a meter-health KPI; -H- a health KPI (hours below outage limits, offered as an alternative to the outage KPIs 04 and 05).
Standing HNTAS: in the HNTAS Milestone 4 specifications, assessed (pass/fail) or reported (expected value only). HNTAS-style: an HNTAS KPI's method applied where the scheme does not yet reach, such as cooling. Heatweb: a diagnostic KPI the platform runs that HNTAS does not define. proposed: defined here, not yet computed by the platform.
Monitoring points Point code, minimum data frequency, and the fields read. "x, else y" is a fallback chain: the first source with data at each reading is used.
Threshold Pass criterion for an assessed KPI; "expected value" for a reported one. "(proposed)" marks a value put forward for review.
Calculation The maths, in as few words as states it exactly.
Period The window the KPI is assessed over.

Notation. tF, tR flow and return temperature (°C); q volumetric flow rate (m³/h); V volume register (m³); E energy register (kWh); ΔE, ΔV register increase over the period or day; 1.163 kWh/(m³·K) the volumetric heat capacity of water; Σ over the period; n readings. Volume weighting pairs readings in 5-minute buckets. Data at a higher frequency than the minimum is used at that frequency.

Rules that apply to every KPI. Readings that fail the out-of-range bounds for their channel are excluded before any KPI is computed. A setpoint input follows the live setpoint stream where the controls publish one and falls back to the design value where they do not. Consumer Connection KPIs 01 to 03 are assessed across all consumer connections together, not dwelling by dwelling.

Energy Centre (EC)

Code Standing KPI Monitoring points Threshold Calculation Period
EC‑KPI‑01 HNTAS · assessed Energy Centre ARMS connectivity all EC points ≥ 99% received intervals ÷ expected intervals across connected points Monthly
EC‑KPI‑02 HNTAS · assessed Energy Centre monitoring point data completeness all EC points ≥ 95% valid readings ÷ expected readings Monthly
EC‑KPI‑03 HNTAS · assessed Energy Centre monitoring points operational all EC points 100% of ARMS-connected points points with no error/negative/out-of-range values ÷ total points Monthly
EC‑KPI‑04 HNTAS · assessed Energy Centre unplanned interruptions EC · tF (sensor, else heat meter); sensor dP ≤ 3 a year count of >12h periods below min flow temp OR min dP without 48h notice. Uses design/minFlowTemp design/minDPIndex Previous 12 months
EC‑KPI‑05 HNTAS · assessed Energy Centre planned interruptions EC · tF (sensor, else heat meter); sensor dP ≤ 1 a year count of noticed (≥48h) interruptions. Uses design/minFlowTemp design/minDPIndex Previous 12 months
EC‑KPI‑06 HNTAS · reported Energy Centre average flow temperature EC · tF (sensor, else heat meter) [expected average flow temperature] time-weighted mean of flow temperature. Uses design/tF Monthly
EC‑KPI‑07 HNTAS · reported Energy Centre average return temperature EC · tR (sensor, else heat meter) [expected average return temperature] time-weighted mean of return temperature Monthly
EC‑KPI‑08 HNTAS · assessed EC flow temperature variance from set point EC · tF (sensor, else heat meter), tF (setpoint, else design) 0 ± 2 °C mean |tF - setpoint| Monthly
EC‑KPI‑09A HNTAS · assessed EC volume weighted average flow temperature (VWAFT) EC · tF (heat meter, else sensor); heat meter m³/h [expected] ± 3 °C Σ(tF · flow volume) ÷ Σ(volume). Uses design/tF Monthly
EC‑KPI‑09B HNTAS · assessed EC VWAFT (weather-compensated variant) EC · tF (heat meter, else sensor), tF (setpoint, else design); heat meter m³/h tracks compensated setpoint ± 3 °C as 09A against live setpoint Monthly
EC‑KPI‑10A HNTAS · assessed EC flow temperature stability EC · tF (sensor, else heat meter), tF (setpoint, else design) ≥ 95% within thresholds 1 - (time above upper + below lower) ÷ total Monthly
EC‑KPI‑10B HNTAS · assessed EC flow temperature stability (weather-compensated) EC · tF (sensor, else heat meter), tF (setpoint, else design) ≥ 95% as 10A against compensated setpoint Monthly
EC‑KPI‑11 HNTAS · assessed EC flow temperature uptime EC · tF (sensor, else heat meter) ≥ 98% above minimum flow temp (99.5% at M4) time above minimum ÷ total time. Uses design/minFlowTemp Monthly
EC‑KPI‑12 HNTAS · assessed EC pressure differential uptime EC · sensor dP ≥ 99% above minimum dP (99.5% at M4) time above minimum dP ÷ total. Uses design/minDPIndex Monthly
EC‑KPI‑13 HNTAS · assessed Max allowable differential pressure exceedance EC · sensor dpSupply 100% below maximum dP 1 - time above max dP ÷ total. Uses design/maxDPSupply Monthly
EC‑KPI‑14 HNTAS · assessed Max allowable operating pressure exceedance EC · sensor pressure 100% below maximum operating pressure 1 - time above max pressure ÷ total. Uses design/maxPressure Monthly
EC‑KPI‑15 HNTAS · assessed Top-up water volume EC · water meter m³ ≤ 1% of system volume per month (0.17% at M4/TS1) make-up volume ÷ system volume per month. Uses design/systemVolume Monthly
EC‑KPI‑16A HNTAS · assessed Heat fraction (source A) EC · heat meter kWh [design heat fraction] source A heat out ÷ total heat out Monthly
EC‑KPI‑16B HNTAS · assessed Heat fraction (source B) EC · heat meter kWh [design heat fraction] source B heat out ÷ total heat out Monthly
EC‑KPI‑18 HNTAS · assessed Network distribution pump energy EC · electricity meter kwhElectric < 1% of annual heat generation sum of distribution pump electricity (excl. shunts). Uses design/kwhAnnualPump Monthly
Hours below outage limits (alternative to 04/05)
EC‑KPI‑H‑01 Heatweb Energy Centre hours below outage limits EC · tF (sensor, else heat meter); sensor dpIndex < 60 h a year, judged on the month pro rata (≈ 4.9 h in 30 days); shorter windows report hours used Σ_i min(t_{i+1} − t_i, 1 h) over readings with tF < tF_min or dP < dP_min; tF and dP spans unioned. Offered as an alternative to KPI-04/05. Uses design/minFlowTemp design/minDPIndex Monthly (pro rata)
heat
EC‑KPI‑17‑A HNTAS · assessed Heat generation efficiency (source A) EC · heat meter kWh; gas meter m3Gas, kWh gas/oil 80% · biomass 75% · electric 98% · heat pump COP 2.0 · CHP QI 105 heat out ÷ fuel in (boiler gross; HP CoP uses emeter). Uses design/efficiency Monthly
EC‑KPI‑17‑B HNTAS · assessed Heat generation efficiency (source B) EC · heat meter kWh; gas meter m3Gas, kWh; electricity meter kwhElectric gas/oil 80% · biomass 75% · electric 98% · heat pump COP 2.0 · CHP QI 105 as 17-A per source. Uses design/efficiency Monthly

District Distribution (DD)

Code Standing KPI Monitoring points Threshold Calculation Period
DD‑KPI‑01 HNTAS · assessed District Distribution ARMS connectivity all DD points ≥ 99% received intervals ÷ expected intervals across connected points Monthly
DD‑KPI‑02 HNTAS · assessed District Distribution monitoring point data completeness all DD points ≥ 95% valid readings ÷ expected readings Monthly
DD‑KPI‑03 HNTAS · assessed District Distribution monitoring points operational all DD points 100% of ARMS-connected points points with no error/negative/out-of-range values ÷ total points Monthly
DD‑KPI‑04 HNTAS · assessed District Distribution unplanned interruptions DD1 · 30 min · tF (sensor, else heat meter); DD · sensor dP ≤ 3 a year count of >12h periods below min flow temp OR min dP without 48h notice. Uses design/minFlowTemp design/minDPIndex Previous 12 months
DD‑KPI‑05 HNTAS · assessed District Distribution planned interruptions DD1 · 30 min · tF (sensor, else heat meter); DD · sensor dP ≤ 1 a year count of noticed (≥48h) interruptions. Uses design/minFlowTemp design/minDPIndex Previous 12 months
DD‑KPI‑06 HNTAS · assessed DD network heat loss DD1 · 30 min · heat meter kWh per design W/dwelling basis initiation kWh - Σ(termination kWh), as W/dwelling Monthly
DD‑KPI‑07 HNTAS · reported DD average flow temperature DD1 · 30 min · tF (sensor, else heat meter) [expected] time-weighted mean. Uses design/tF Monthly
DD‑KPI‑08 HNTAS · reported DD average return temperature DD1 · 30 min · tR (sensor, else heat meter) [expected] time-weighted mean. Uses design/tR Monthly
DD‑KPI‑09 HNTAS · assessed DD flow temperature uptime DD1 · 30 min · tF (sensor, else heat meter) ≥ 98% (99.5% at M4) time above minimum/total. Uses design/minFlowTemp Monthly
DD‑KPI‑10 HNTAS · assessed DD network bypass flow rate DD1 · 30 min · heat meter m³/h [design bypass allowance] initiation q - Σ(termination q). Uses design/maxBypassFlow Monthly
Hours below outage limits (alternative to 04/05)
DD‑KPI‑H‑01 Heatweb District Distribution hours below outage limits DD1 · 30 min · tF (sensor, else heat meter); DD3 · 5 min · sensor dpIndex < 60 h a year, judged on the month pro rata (≈ 4.9 h in 30 days); shorter windows report hours used Σ_i min(t_{i+1} − t_i, 1 h) over readings with tF < tF_min or dP < dP_min; tF and dP spans unioned. Offered as an alternative to KPI-04/05. Uses design/minFlowTemp design/minDPIndex Monthly (pro rata)

Substation (SS)

Code Standing KPI Monitoring points Threshold Calculation Period
SS‑KPI‑01 HNTAS · assessed Substation ARMS connectivity all SS points ≥ 99% received intervals ÷ expected intervals across connected points Monthly
SS‑KPI‑02 HNTAS · assessed Substation monitoring point data completeness all SS points ≥ 95% valid readings ÷ expected readings Monthly
SS‑KPI‑03 HNTAS · assessed Substation monitoring points operational all SS points 100% of ARMS-connected points points with no error/negative/out-of-range values ÷ total points Monthly
SS‑KPI‑04 HNTAS · assessed Substation unplanned interruptions SS1 · 5 min · tF (sensor, else heat meter); SS · sensor dP ≤ 3 a year count of >12h periods below min flow temp OR min dP without 48h notice. Uses design/minFlowTempOff design/minDPIndex Previous 12 months
SS‑KPI‑05 HNTAS · assessed Substation planned interruptions SS1 · 5 min · tF (sensor, else heat meter); SS · sensor dP ≤ 1 a year count of noticed (≥48h) interruptions. Uses design/minFlowTempOff design/minDPIndex Previous 12 months
SS‑KPI‑06 HNTAS · reported Substation average flow temperature SS1 · 5 min · tF (sensor, else heat meter) [expected average flow temperature] time-weighted mean. Uses design/tFOff Monthly
SS‑KPI‑07 HNTAS · reported Substation average return temperature SS1 · 5 min · tR (sensor, else heat meter) [expected average return temperature] time-weighted mean Monthly
SS‑KPI‑08 HNTAS · assessed SS flow temperature variance from set point SS1 · 5 min · tF (sensor, else heat meter); SS · tF (setpoint, else design) 0 ± 2 °C mean |tF - setpoint| Monthly
SS‑KPI‑09A HNTAS · assessed SS volume weighted average flow temperature SS1 · 5 min · tF (heat meter, else sensor); heat meter m³/h [network flow temp] ± 3 °C Σ(tF · volume) ÷ Σ(volume). Uses design/tFOff Monthly
SS‑KPI‑09B HNTAS · assessed SS VWAFT (weather-compensated) SS1 · 5 min · tF (heat meter, else sensor); heat meter m³/h; SS · tF (setpoint, else design) ± 3 °C vs compensated setpoint as 09A Monthly
SS‑KPI‑10A HNTAS · assessed SS flow temperature stability SS1 · 5 min · tF (sensor, else heat meter); SS · tF (setpoint, else design) ≥ 95% within thresholds 1-(out-of-band time/total) Monthly
SS‑KPI‑10B HNTAS · assessed SS flow temperature stability (weather-comp) SS1 · 5 min · tF (sensor, else heat meter); SS · tF (setpoint, else design) ≥ 95% as 10A Monthly
SS‑KPI‑11 HNTAS · assessed SS flow temperature uptime SS1 · 5 min · tF (sensor, else heat meter) ≥ 98% (99.5% at M4) time above minimum/total. Uses design/minFlowTempOff Monthly
SS‑KPI‑12 HNTAS · assessed Substation average approach temperature SS2 · 5 min · heat meter tROff; SS1 · 5 min · heat meter tR ≤ design maximum approach mean(primary tR - secondary tR). Uses design/maxApproachTemp Monthly
SS‑KPI‑13 HNTAS · assessed SS pressure differential uptime SS · sensor dP ≥ 99% (99.5% at M4) time above min dP/total. Uses design/minDPIndex Monthly
SS‑KPI‑14 HNTAS · assessed SS max differential pressure exceedance SS6 · 5 min · sensor dpOff 100% below max dP 1-time above/total. Uses design/maxDPOff Monthly
SS‑KPI‑15 HNTAS · assessed SS max operating pressure exceedance SS · sensor pressure 100% below max pressure 1-time above/total. Uses design/maxPressure Monthly
SS‑KPI‑16 HNTAS · assessed SS top-up water volume SS · water meter m³ ≤ 1%/month (0.17% at M4) make-up/system volume monthly. Uses design/systemVolume Monthly
SS‑KPI‑17 HNTAS · assessed SS distribution pump energy SS3 · 30 min · electricity meter kwhElectric < 1% of annual heat throughput pump electricity sum (excl. shunts). Uses design/kwhAnnualPump Monthly
Hours below outage limits (alternative to 04/05)
SS‑KPI‑H‑01 Heatweb Substation hours below outage limits SS2 · 5 min · tFOff (sensor, else heat meter); SS5 · 5 min · sensor dpIndex < 60 h a year, judged on the month pro rata (≈ 4.9 h in 30 days); shorter windows report hours used Σ_i min(t_{i+1} − t_i, 1 h) over readings with tF < tF_min or dP < dP_min; tF and dP spans unioned. Offered as an alternative to KPI-04/05. Uses design/minFlowTempOff design/minDPIndex Monthly (pro rata)

Communal Distribution (CD)

Code Standing KPI Monitoring points Threshold Calculation Period
CD‑KPI‑01 HNTAS · assessed Communal Distribution ARMS connectivity all CD points ≥ 99% received intervals ÷ expected intervals across connected points Monthly
CD‑KPI‑02 HNTAS · assessed Communal Distribution monitoring point data completeness all CD points ≥ 95% valid readings ÷ expected readings Monthly
CD‑KPI‑03 HNTAS · assessed Communal Distribution monitoring points operational all CD points 100% of ARMS-connected points points with no error/negative/out-of-range values ÷ total points Monthly
CD‑KPI‑04 HNTAS · assessed Communal Distribution unplanned interruptions CD1 · 30 min · tF (sensor, else heat meter); CD · sensor dP ≤ 3 a year count of >12h periods below min flow temp OR min dP without 48h notice. Uses design/minDPIndex Previous 12 months
CD‑KPI‑05 HNTAS · assessed Communal Distribution planned interruptions CD1 · 30 min · tF (sensor, else heat meter); CD · sensor dP ≤ 1 a year count of noticed (≥48h) interruptions. Uses design/minDPIndex Previous 12 months
CD‑KPI‑06 HNTAS · assessed CD network heat loss CD1 · 30 min · heat meter kWh per design W/dwelling basis initiation kWh - Σ(termination kWh), as W/dwelling Monthly
CD‑KPI‑07 HNTAS · reported CD average flow temperature CD1 · 30 min · tF (sensor, else heat meter) [expected] time-weighted mean. Uses design/tF Monthly
CD‑KPI‑08 HNTAS · reported CD average return temperature CD1 · 30 min · tR (sensor, else heat meter) [expected] time-weighted mean. Uses design/tR Monthly
CD‑KPI‑09 HNTAS · assessed CD network bypass flow rate CD1 · 30 min · heat meter m³/h [design bypass allowance] initiation q - Σ(termination q) Monthly
Hours below outage limits (alternative to 04/05)
CD‑KPI‑H‑01 Heatweb Communal Distribution hours below outage limits CD1 · 30 min · tF (sensor, else heat meter); CD3 · 5 min · sensor dpIndex < 60 h a year, judged on the month pro rata (≈ 4.9 h in 30 days); shorter windows report hours used Σ_i min(t_{i+1} − t_i, 1 h) over readings with tF < tF_min or dP < dP_min; tF and dP spans unioned. Offered as an alternative to KPI-04/05. Uses design/minFlowTemp design/minDPIndex Monthly (pro rata)

Consumer Connection (CC)

Code Standing KPI Monitoring points Threshold Calculation Period
CC‑KPI‑01 HNTAS · assessed Consumer Connection ARMS connectivity (aggregated) all CC points ≥ 90% received intervals ÷ expected intervals across ALL CC points combined Monthly
CC‑KPI‑02 HNTAS · assessed Consumer Connection data completeness (aggregated) all CC points ≥ 85% valid readings ÷ expected readings across all CCs Monthly
CC‑KPI‑03 HNTAS · assessed Consumer Connection monitoring points operational (aggregated) all CC points = 100% points with no error/negative/out-of-range values ÷ total points (two-stage; ALL heat-meter channels tF tR m³ q kW kWh) Monthly
CC‑KPI‑04 HNTAS · assessed Consumer Connection unplanned interruptions CC1 · 30 min · tF (heat meter, else sensor) ≤ 3 a year count of unplanned interruptions (≥ 12 h below minimum flow temp) Previous 12 months
CC‑KPI‑05 HNTAS · assessed Consumer Connection planned interruptions CC1 · 30 min · tF (heat meter, else sensor) ≤ 1 a year count of planned interruptions (≥ 12 h below minimum flow temp) Previous 12 months
CC‑KPI‑06 HNTAS · reported Consumer Connection heat generation efficiency CC1 · 30 min · tF (heat meter, else sensor) ≥ 90% of design efficiency target heat generated at the CC ÷ energy input to the CC Monthly
CC‑KPI‑07 HNTAS · assessed Consumer Connection volume-weighted average return temperature CC1 · 30 min · tR (heat meter, else sensor); heat meter m³/h ≤ 45 °C Σ(tR · q) ÷ Σ(q) by 5-min buckets Monthly
CC‑KPI‑07A HNTAS · reported Consumer Connection average return temperature (reported) CC1 · 30 min · tR (heat meter, else sensor) expected value time-average of tR Monthly
CC‑KPI‑08 HNTAS · assessed Consumer Connection volume-weighted average temperature difference (VWATD) CC1 · 30 min · heat meter kWh, m³ ≥ 5 °C (pair: CC-07 or CC-08 must be met) kWh register delta ÷ (1.163 · m³ register delta) Monthly
Cooling forms
CC‑KPI‑C‑01 HNTAS-style · proposed Consumer Connection cooling ARMS connectivity (aggregated) CC1 · all cooling meter channels ≥ 90% Σ intervals received ÷ Σ intervals expected, all cooling CC points combined Monthly
CC‑KPI‑C‑02 HNTAS-style · proposed Consumer Connection cooling data completeness (aggregated) CC1 · all cooling meter channels ≥ 85% Σ valid readings ÷ Σ expected readings, all cooling CC points combined Monthly
CC‑KPI‑C‑03 HNTAS-style · proposed Consumer Connection cooling monitoring points operational (aggregated) CC1 · 30 min · cooling meter kWh, m³, m³/h, kW, tF, tR = 100% points with no error, negative or out-of-range value ÷ points connected with complete data (C-01, C-02); every cooling-meter channel Monthly
CC‑KPI‑C‑04 HNTAS-style · proposed Consumer Connection cooling unplanned interruptions CC1 · 30 min · cooling meter tF ≤ 3 a year count of unplanned periods ≥ 12 h with chilled flow tF > maximum chilled flow temperature. Uses design/tFMaxCool (proposed) Previous 12 months
CC‑KPI‑C‑05 HNTAS-style · proposed Consumer Connection cooling planned interruptions CC1 · 30 min · cooling meter tF ≤ 1 a year count of planned periods ≥ 12 h with chilled flow tF > maximum chilled flow temperature. Uses design/tFMaxCool (proposed) Previous 12 months
CC‑KPI‑C‑07 HNTAS-style · proposed Consumer Connection cooling volume-weighted average return temperature CC1 · 30 min · cooling meter tR, m³/h ≥ design cooling return − 2 °C (proposed; pair: C-07 or C-08 must be met) Σ(tR · q) ÷ Σ q over 5-minute buckets. Uses design/tRCool (proposed) Monthly
CC‑KPI‑C‑07A HNTAS-style · reported · proposed Consumer Connection cooling average return temperature (reported) CC1 · 30 min · cooling meter tR expected value Σ tR ÷ n (time average) Monthly
CC‑KPI‑C‑08 HNTAS-style Consumer Connection cooling volume-weighted average temperature difference CC1 · 30 min · cooling meter kWh, m³ ≥ 4 °C (proposed; pair: C-07 or C-08 must be met) ΔT = ΔE ÷ (1.163 · ΔV); ΔE, ΔV = register deltas over the period (kWh, m³) Monthly
Meter health
CC‑KPI‑M‑01 Heatweb Meter reporting (not silent) CC1 · 30 min · heat meter kWh; cooling meter kWh last reading within 72 h of period end a reading on every meter within the last 72 h of the period Rolling 7 days; month
CC‑KPI‑M‑02 Heatweb Meter channel coverage CC1 · 30 min · heat meter kWh, m³, m³/h, kW, tF, tR 6 of 6 channels channels with ≥ 1 reading among kWh, m³, m³/h, kW, tF, tR (the fewest on any of the dwelling’s meters) Rolling 7 days; month
CC‑KPI‑M‑03 Heatweb Meter reading cadence CC1 · 30 min · heat meter kWh; cooling meter kWh ≥ 0.9 readings per day energy-register readings ÷ days in period Rolling 7 days; month
CC‑KPI‑M‑04 Heatweb Register integrity CC1 · 30 min · heat meter kWh; cooling meter kWh 0 faults days with ΔE < 0 (register stepped back) or ΔE > 500 kWh (implausible jump), all the dwelling’s meters Rolling 7 days; month
CC‑KPI‑M‑05 Heatweb Plausible temperature difference CC1 · 30 min · heat meter kWh, m³; cooling meter kWh, m³ 0 °C ≤ ΔT ≤ 80 °C ΔT = ΔE ÷ (1.163 · ΔV) within bounds; outside = scaling, units or a replaced meter Rolling 7 days; month
CC‑KPI‑M‑06 Heatweb Flow comes to rest (no constant flow) CC1 · 30 min · heat meter m³/h; cooling meter m³/h ≥ 2% of flow readings at zero readings with q = 0 ÷ all q readings, per meter (needs ≥ 6 readings); below target = flow never at rest: bypass or control fault Rolling 7 days; month
CC‑KPI‑M‑07 Heatweb No low temperature difference at volume CC1 · 30 min · heat meter kWh, m³; cooling meter kWh, m³ heat: not (ΔT < 5 °C and > 150 L/day); cooling: not (ΔT < 2 °C and > 1,000 L/day) ΔT = ΔE ÷ (1.163 · ΔV); L/day = 1000 · ΔV ÷ days Rolling 7 days; month
CC‑KPI‑M‑08 Heatweb No simultaneous heating and cooling CC1 · 30 min · heat meter kWh; cooling meter kWh < 30% of active days days with heat ΔE > 0.5 kWh and cooling ΔE > 0.5 kWh ÷ days with either Rolling 7 days; month
CC‑KPI‑M‑09 Heatweb Load follows demand (no flat load) CC1 · 30 min · heat meter kWh CV ≥ 0.2 CV = σ ÷ μ of daily heat ΔE over ≥ 7 days, applied when μ > 2 kWh/day; below target = constant load: control fault Rolling 7 days; month
CC‑KPI‑M‑10 Heatweb · reported Consumption band (reported) CC1 · 30 min · heat meter kWh, m³; cooling meter kWh, m³ low: < 2 kWh/day and < 40 L/day; high: > max(15 kWh/day, 2 × site median) daily ΔE and ΔV compared with the site's median dwelling Rolling 7 days; month
CC‑KPI‑M‑11 Heatweb · reported Cooling offset by heating (24 h overlap) CC1 · 30 min · heat meter kWh; cooling meter kWh expected value (reported; site-wide figure on the combined element) Σ_d min(ΔE_heat,d, ΔE_cool,d) ÷ Σ_d ΔE_cool,d over the period's days Rolling 7 days; month