HNQAP

EC-KPI-15 Top-up water volume

Element Energy Centre (EC)
Standing HNTAS · assessed
Monitoring points EC · water meter m³
Threshold ≤ 1% of system volume per month (0.17% at M4/TS1)
Calculation make-up volume ÷ system volume per month. Uses design/systemVolume
Period Monthly

Discuss this KPI

Is the threshold right? Does the calculation match what you compute on your networks? Comment on EC-KPI-15, or report how it behaves on your data. Comments are public and are read before every revision.

Machine-readable

This KPI is a row of kpi-reference.json (element EC, code EC-KPI-15). The notation and rules that apply to every KPI are on the reference page.